Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 508     Entry time: Friday, May 06, 2016, 10:18
Author: Aaron Schmidt 
Target/No.#: SiC 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 41077-3 
Heat Shield W.O#:  
Status:  
Subject: EE new insulator Test (2) No PE 

Friday, May 06, 2016, 10:18: Begin roughing

Venting: VCR on HS not closed

Friday, May 06, 2016, 12:58: Roughing

Friday, May 06, 2016, 13:22: Started turbos

Friday, May 06, 2016, 15:32: Vacuum at 1.2E-5 T


Monday, May 09, 2016, 09:07: Opened water  supply for heat shield. Vacuum stable at 2.78E-7 T.

Monday, May 09, 2016, 09:16:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.06
 TBHT 30.8 3.33
 COIL + EE  28.5 5.24
 TGHT  28.7 5.80

Monday, May 09, 2016, 09:35: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.

Monday, May 09, 2016, 13:26:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 31.8

3.40

 COIL + EE  28.8 5.19
 TGHT  30.0 5.82

 


Tuesday, May 10, 2016, 08:18:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.06
 TBHT 30.3

3.27

 COIL + EE  28.8 5.19
 TGHT  29.8 5.77

Tuesday, May 10, 2016, 12:36:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.06
 TBHT 29.9

3.20

 COIL + EE  28.8 5.18
 TGHT  29.8 5.82

Tuesday, May 10, 2016, 15:21:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 4.02
 TBHT 29.4

3.15

 COIL + EE  28.8 5.16
 TGHT  30.0 5.73

 


Wednesday, May 11, 2016, 08:45:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 29.3

3.16

 COIL + EE  28.8 5.13
 TGHT  30.0 5.77

Wednesday, May 11, 2016, 14:13:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.8 4.06
 TBHT 29.6

3.16

 COIL + EE  29.0 5.19
 TGHT  30.0 5.78

 

Wednesday, May 11, 2016, 17:39: Ramping down TGHT/TBHT -AM


Thursday, May 12, 2016, 08:04: Ion gauge off. Turbo pumps off.

Thursday, May 12, 2016, 11:08: Water lines off/purged. Venting.

Thursday, May 12, 2016, 11:32: Source off, lock on.

ELOG V2.9.2-2455