Message ID: 1010     Entry time: Thursday, May 30, 2024, 16:00
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: 44692-4 
Heat Shield W.O#: 45235-18 
Status: In progress 
Subject: Conditioning spare FEBIAD 

Anode short repaired (Should be :) )

Thursday, May 30, 2024, 15:56: Roughing.

Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.

Bypassed IG1. TGHT / TBHT @ 5 A. Ok.

Anode to 100 V. Ok.

Thursday, May 30, 2024, 16:12: TGHT / TBHT / Anode to 0. Bypass removed.

Thursday, May 30, 2024, 16:26: TP1B on.

Thursday, May 30, 2024, 16:33: TP1A on.

Thursday, May 30, 2024, 16:41: IG1 on.


Friday, May 31, 2024, 08:50: Anode to 400 V. OK. Tapped back down. Vacuum @ 5.07e-07T 

Friday, May 31, 2024, 09:12   increasing TGHT TBHT to 440 230A at 1A/30s- dn

 Friday, May 31, 2024, 10:20  at ~130A, increased heating rate to 1.4A/10s - dn

 Friday, May 31, 2024, 11:22  anode increased to 200V, TGHT TBHT at 440 230A.  increasing TBHT to 290A

Friday, May 31, 2024, 11:38  ANODE shorted to hvc at TBHT=286A

Friday, May 31, 2024, 11:39  decreased TBHT to 285A. waiting to reestablish ANODE voltage.

Friday, May 31, 2024, 11:48 decreased TBHT to 280A, waiting to reestablish ANODE voltage. 

 Friday, May 31, 2024, 12:59 decreased TBHT to 275A, waiting to reestablish ANODE voltage.  

Friday, May 31, 2024, 12:09 decreased TBHT to 270A, waiting to reestablish ANODE voltage.  ---> recovered after 2 min at 270

Friday, May 31, 2024, 14:09 decreased TGHT TBHT to 0 for target removal monday.

Monday, June 03, 2024, 09:04 TP1A TP1B off. Waiting 30min for turbo pumps to slow, prior to venting to atmosphere.

 Monday, June 03, 2024, 10:07 venting. VV1 open. - target subsequently removed for testing possible shorting fix

Friday, June 14, 2024, 16:37:  Ceramic spacer placed between the anode and plasma electrode.

Target returned to test stand. Rough vacuum on.

Monday, June 17, 2024, 09:34:  TP1A on, TP1B on.

 Monday, June 17, 2024, 16:54  increasing tght tbht to 440 230 A at 1A/30s

 Tuesday, June 18, 2024, 14:14 Increasing ANODE to 100V .    Voltage holding.  Increasing TBHT to 290A, watching anode voltage for possible temperature induced short.

 Tuesday, June 18, 2024, 14:54   ANODE shorted at TBHT = 290A.   cooling TBHT to reestablish ANODE OL.

Tuesday, June 18, 2024, 15:04 ANODE OL reestablished at TBHT = 283A

Tuesday, June 18, 2024, 15:05  Increasing TBHT again. 1A/2min

Tuesday, June 18, 2024, 15:32 ANODE shorted again when TBHT reached 290A

Tuesday, June 18, 2024, 15:32   cooling tght tbht. ANODE OL reestablished at TBHT 275A

Tuesday, June 18, 2024, 15:42 reheating to 440A 290A with ANODE at zero, to see if there is a difference compared to heating with ANODE ON/OFF

 Tuesday, June 18, 2024, 15:55  confirmed shorted when hot. cooling to zero. 1A/30s

 

 