Aurelia has been testing on the ISAC TS since last week. Thermocouples are installed in the end cap, left side & the ionizer.
No elog was initiated, but much has happened.
Site wide power outage on Friday/Saturday caused problems. The TS was running at that time & was also affected. Reboots occurred on the weekend & testing resumed. IG6 was reset yesterday.
Thursday, November 16, 2023, 09:30: IV4 closed. TP6, TP2, TP1B, TP1A off. IG6 & IG1 off. PS off.
Thursday, November 16, 2023, 13:11: TP6 & TP2 restarted.
Monday, November 20, 2023, 12:06: IV4 closed. IG6 off. TP6 & TP2 off.
Monday, November 20, 2023, 12:42: Venting beamline side. |