Due to previous issues, a full run / test should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA on.
Friday, April 05, 2019, 07:03: Begin opening / closing gas lines until they can be opened & stable.
Friday, April 05, 2019, 07:14: Gas lines open.
Friday, April 05, 2019, 07:16: Power / sources on. Vacuum down to 1.25e-06T
Friday, April 05, 2019, 07:18: Optics on & Set.
Friday, April 05, 2019, 07:19: IV4 Opened.
Friday, April 05, 2019, 07:21: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min
Friday, April 05, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200 V.
Friday, April 05, 2019, 09:40: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min
Friday, April 05, 2019, 14:01: Beam on FC0 & wire scans. Mass scan provides no reading. (Max current after CONST2 has changed). Inquire why.
No sparks have occurred on this run. Operationally, appears the PS switches were effective.
Friday, April 05, 2019, 14:05: Begin auto-cooling @ 2A per min.
Friday, April 05, 2019, 14:56 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.
Monday, April 08, 2019, 06:57: RGA off. Gas lines closed. IV4 Closed.
Monday, April 08, 2019, 07:01: Power / Sources off.
Monday, April 08, 2019, 07:01: IG1 off. Turbo pumps off.
Monday, April 08, 2019, 08:11: Venting. |