Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
IG1 filament beeing replaced.
Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)
Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.
Thursday, October 22, 2015, 15:02: Venting
Re-tightened all newly installed fittings.
Thursday, October 22, 2015, 15:41: Roughing
Thursday, October 22, 2015, 16:12: Turbos started.
Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on
Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.
Tuesday, October 27, 2015, 08:57: Venting
Tuesday, October 27, 2015, 14:25: roughing
Tuesday, October 27, 2015, 15:03: Turbos started.
Water can still be seen on the RGA when the TGHT cooling lines are pressurized.
Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.
Monday, November 02, 2015, 08:30: Venting |