Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS installed in test stand with Ta tube as heat load.
Friday, April 04, 2014, 16:29: Chamber roughing started
Friday, April 04, 2014, 16:51: Turbos started
Friday, April 04, 2014, 16:59: TP1B at speed
Friday, April 04, 2014, 17:00: TP1A at speed
Friday, April 04, 2014, 17:00: IG1 Turned on vacuum at 2.8e-05T
Tuesday, April 08, 2014, 10:37: Vacuum 1.8e-07 T - Heatshield water turned on
Tuesday, April 08, 2014, 10:40: No change in vacuum pressure.
Wednesday, April 09, 2014, 11:46: Started heating tght to 200 amps
Wednesday, April 09, 2014, 14:58: Heating increased to 400 amps
Thursday, April 10, 2014, 14:58: Heating increased to 580 amps
By AM
Friday, April 11, 2014, 14:57: Started cool down. Vacuum at 4.2E-7 T
By AM
Wednesday, April 23, 2014, 09:18: Turbos stopped. Vacuum at 1.2E-7 T
Wednesday, April 23, 2014, 13:50: Venting
Wednesday, April 23, 2014, 14:14: Heat Shield removed |