Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Entry  Friday, March 21, 2014, 14:12, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2 TMSCG2_2014-03-21.png
    Reply  Thursday, June 12, 2014, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2 
Message ID: 383     Entry time: Thursday, June 12, 2014, 09:28     In reply to: 366
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: Elevated backing pressure on ISAC Test Stand TMS:RP2 

Anders Mjos wrote:

The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.

E-fault 7258.

 

 Edi replaced the backing pump on June 5th.

ELOG V2.9.2-2455