Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
Test-Stand
Not logged in
List
Message ID:
52
Entry time:
Monday, March 05, 2012, 19:31
Author:
Friedhelm Ames
Target/No.#:
Source:
Station:
Module:
Target Oven W.O#:
Heat Shield W.O#:
Status:
Failed
Subject:
turbo pumps failed
Both turbo pumps at the source box cannot be started. A fault report has been issued.
ELOG V2.9.2-2455