No wires connected yet.
Monday, June 22, 2015, 15:48: Roughing
Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.
Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T
Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T
Tuesday, June 23, 2015, 10:32: Stopped turbos
Tuesday, June 23, 2015, 11:01: Venting
Tuesday, June 23, 2015, 11:22: Roughing
Tuesday, June 23, 2015, 13:37: Venting
Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.
Wednesday, June 24, 2015, 09:29: Venting
Replaced f/t with a blank off.Installed TM2 FEBIAD test target
Wednesday, June 24, 2015, 10:31: Roughing
Wednesday, June 24, 2015, 11:07: Started turbos.
Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T
Thursday, July 09, 2015
Installed the fixed f/t. |