Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 451     Entry time: Monday, June 22, 2015, 15:49
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: Installed new 9-pin feed through 

No wires connected yet.

Monday, June 22, 2015, 15:48: Roughing


Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.

Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T

Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T

Tuesday, June 23, 2015, 10:32: Stopped turbos

Tuesday, June 23, 2015, 11:01: Venting

Tuesday, June 23, 2015, 11:22: Roughing

Tuesday, June 23, 2015, 13:37: Venting

Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.


Wednesday, June 24, 2015, 09:29: Venting

Replaced f/t with a blank off.Installed TM2 FEBIAD test target

Wednesday, June 24, 2015, 10:31: Roughing

Wednesday, June 24, 2015, 11:07: Started turbos.

Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T


Thursday, July 09, 2015

Installed the fixed f/t.

Attachment 1: 9-pin_feed_through.jpg  1.400 MB  Uploaded Monday, June 22, 2015, 17:07  | Show | Hide all
ELOG V2.9.2-2455