Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 183     Entry time: Monday, August 27, 2012, 13:21
Author: Aurelia Laxdal 
Target/No.#: NiO#1 
Source: HP-FEBIAD 
Station: ITE 
Module: TM4 
Target Oven W.O#:  
Heat Shield W.O#:  
Status: In progress 
Subject: HV conditioning at Test Stand  

Did HV conditioning up to TSG:BIAS=30kV, TSH=EE=-600V

Turned off the HV for Kazuya to check the connection/output of the TSG:TGHT Xantrex power supply.

ELOG V2.9.2-2455