Message ID: 525     Entry time: Thursday, July 21, 2016, 09:51
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Febiad Test - NEW COIL - No PE 

Thursday, July 21, 2016, 08:55: Roughing.

Thursday, July 21, 2016, 09:50: Turbo pumps started.

Thursday, July 21, 2016, 09:54: Ion Gauge on.

Thursday, July 21, 2016, 11:12: RGA on.

Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T


Friday, July 22, 2016, 08:40: Opening gas lines.

Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.

Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.

Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm

Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM

Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM


Monday, July 25, 2016, 09:39:

Device

  Temp
[C]
 Flow
[lpm]
 HS + MSP  38.0 3.82
 TBHT 27.9 2.96
 COIL + EE  27.7 4.94
 TGHT  29.7 5.51

Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.


Wednesday, July 27, 2016, 14:37: Spark tripped off IG6

Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV

Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV

Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV

Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)

Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target


Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.

Thursday, July 28, 2016, 09:09: Source gas control off. Venting.