Message ID: 506     Entry time: Thursday, April 21, 2016, 14:26
Author: Aaron Schmidt 
Target/No.#: Ta#48 
Source: HP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 41369-5 
Heat Shield W.O#: 41120-5 
Status: In progress 
Subject: Conditioning Ta#48 

Thursday, April 21, 2016, 14:25: Begin pumping down.

Thursday, April 21, 2016, 15:02: Turbo pumps started.

Thursday, April 21, 2016, 15:34: Ion gauge on.

Thursday, April 21, 2016, 15:43: RGA on


Friday, April 22, 2016, 08:30: Opened water  supply for heat shield. Vacuum stable at 2.4E-7 T. No response on RGA.

Friday, April 22, 2016, 08:44: Anode breaker switched on. While off, a charge was measured via TSH:ANODE:RDCUR.


Monday, April 25, 2016, 08:08: Noticed Turbo pump 1 shut down around roughly 4 pm Sunday afternoon. Will attempt restart.

Monday, April 25, 2016, 08:15: Interlocks bypassed for TP1, Pump Restarted.

Monday, April 25, 2016, 08:23: TP1 @ speed. Vacuum recovered to 1.9E-7 T

 Monday, April 25, 2016, 08:41: IV4 opened. Auto ramping TGHT/TBHT to 400A/150A @ 2A/min.

Monday, April 25, 2016, 08:42: Turned on optics. BIAS/EZL/EE to 30/13/1.5kV

Monday, April 25, 2016, 13:40: Mass scan (test)

Monday, April 25, 2016, 14:04: Ramp down TGHT to 350A @ 2A/min.


Tuesday, April 26, 2016, 08:10: Auto ramping TGHT/TBHT to 580A/220A @ 2A/min.

Tuesday, April 26, 2016, 14:10: Auto ramping TBHT to 230A @ 2A/min.

Tuesday, April 26, 2016, 14:10: Ramp Down TBHT to 220A @ 2A/min.


Wednesday, April 27, 2016, 07:55: Auto ramp down TGHT/TBHT @ 2A/min to 0A.

Wednesday, April 27, 2016, 12:56: Ramp down Complete. Sources and optics off. IV4 Closed


Thursday, April 28, 2016, 08:52

 

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  28.9 4.02
 TBHT  28.6 3.16
 COIL + EE  28.3 5.22
 TGHT  28.7 5.75

 


Monday, May 02, 2016, 13:32: Ion gauge off. Turbo pumps off.

Monday, May 02, 2016, 15:03: Water supply closed.

Monday, May 02, 2016, 15:11: Venting

Attachment 1: TS-2016-04-21_Ta#48.rga  2.448 MB  Uploaded Thursday, May 19, 2016, 11:52