Message ID: 853     Entry time: Thursday, February 18, 2021, 11:03
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: DI water pump configuration 

https://elog.triumf.ca/TIS/Test-Stand/847

There was a previous DI CU-LCW  pump trip as per the above elog. The CU-LCW pump was configured this morning. The water pressure is set to 80 PSI as per the MCR. Any further can overload & trip the pump. 

Thursday, February 18, 2021, 10:55: Current flow rates & pressure read at the TS

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 22.30 3.8
 TBHT 22.14

6.27

 COIL + EE 22.08 1.74
 TGHT 22.16 5.04

DI water pressure as per the gauge on the supply side of the FS#2-5 manifold @ 85 PSI.

Noticeable flow rate reduction based on previous target conditioning logs. Previous pressure was around 100 PSI.