Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 510     Entry time: Wednesday, June 01, 2016, 10:02
Author: Aaron Schmidt 
Target/No.#: UC#16 
Source: LP-IG-LIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 39814-V2-1 
Heat Shield W.O#:  
Status:  
Subject: Conditioning Heat shield for UC#16 

Wednesday, June 01, 2016, 10:02: Begin roughing.

Wednesday, June 01, 2016, 10:44: Turbo pumps started.

Wednesday, June 01, 2016, 10:47: Ion Gauge IG1 ON.

Wednesday, June 01, 2016, 10:50; Turbos at speed. Vacuum at 1.24-5T.


Thursday, June 02, 2016, 08:54: Sources and power supply on. RGA on. Open water. Vacuum stable at 2.1E-07T. Heat shield water flow at 4.0 lpm.

Thursday, June 02, 2016, 09:05: Auto ramping TGHT/TBHT @ 2A min to 580A/250A

Thursday, June 02, 2016, 09:10: BIAS/EZL/EE to 30/13/1.5kV. IV4 opened

Thursday, June 02, 2016, 11:54: Stopped auto ramping for lunch break. - AM

Thursday, June 02, 2016, 13:01 : Auto ramping resumed. -AM

Thursday, June 02, 2016, 15:03: TGHT/TBHT @ 580A/250A

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP  36.1 3.99
 TBHT 27.2 3.14
 COIL + EE  27.1 5.18
 TGHT  29.2 5.78

 

Thursday, June 02, 2016, 20:43: ramping down TGHT/TBHT at 2 / 1 A/min - AM


Friday, June 03, 2016, 08:06: Source off. Turbo pumps off. Ion gauge off. IV4 closed.

Friday, June 03, 2016, 08:21: Supply water pressure: 103 PSI. Return pressure: 10 PSI.

Friday, June 03, 2016, 09:27: Venting.

Attachment 1: OMEGA_OM-DAQPRO-5300_03-Jun-16_08.14.47.dlp  176 kB  Uploaded Friday, June 03, 2016, 09:17
Attachment 2: TS-2016-06-02_UC#16.rga  103 kB  Uploaded Friday, June 03, 2016, 09:17
Attachment 3: TS-2016-06-02-13-46_UC#16.rga  581 kB  Uploaded Friday, June 03, 2016, 09:18
Attachment 4: UC#16.docx  730 kB  Uploaded Friday, June 03, 2016, 09:18
ELOG V2.9.2-2455