Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 959     Entry time: Thursday, February 02, 2023, 12:44
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 44062-1-SK  
Heat Shield W.O#: 45235-1 
Status: In progress 
Subject: Conditioning UC#x assembly 

SK Series of LP-SIS targets are for conditioning only.

Thursday, February 02, 2023, 12:41: Roughing.

Thursday, February 02, 2023, 12:43: BV1A open.

Thursday, February 02, 2023, 13:30: TP1B on.

Thursday, February 02, 2023, 13:34: TP1B at speed. TP1A on.

Thursday, February 02, 2023, 13:43: TP1A at speed. IG1 on.

Thursday, February 02, 2023, 14:53: Waterlines opened. Vacuum Ok @ 5.38e-06T.

Thursday, February 02, 2023, 14:55: PS / Sources on. Manually tap up TGHT / TBHT to 5 A. OK.


Friday, February 03, 2023, 06:32: Vacuum @ 6.56e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 


Monday, February 06, 2023, 07:39: Vacuum @ 8.36e-07T. Auto-cooling @ 2 A per min.


Tuesday, March 28, 2023, 13:45: Power / sources off.

Tuesday, March 28, 2023, 13:47: IG1 off. TP1A & TP1B off.


Wednesday, March 29, 2023, 07:53: Venting. 

ELOG V2.9.2-2455