Message ID: 684     Entry time: Wednesday, September 12, 2018, 11:19
Author: Aaron Schmidt 
Target/No.#: Ta#57 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 41177-3 
Heat Shield W.O#: 42752-6 
Status: In progress 
Subject: Conditioning Ta#57 

Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.

Wednesday, September 12, 2018, 11:52: Turbo pumps started. 

Wednesday, September 12, 2018, 12:40: Ion gauge on.


Thursday, September 13, 2018, 07:30: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T

Thursday, September 13, 2018, 07:33: Power/sources on.

Thursday, September 13, 2018, 07:37: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min

Thursday, September 13, 2018, 07:42: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.

Thursday, September 13, 2018, 07:43: IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.6 4.02
 TBHT 24.4 3.10
 COIL + EE 24.4 5.13
 TGHT  24.6 5.77

Thursday, September 13, 2018, 07:44: Optics set.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 24.6 3.13
 COIL + EE 24.4 5.16
 TGHT  26.5 5.82

Thursday, September 13, 2018, 13:56: Vacuum @ 9.97e-07T.


Friday, September 14, 2018, 09:55:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 24.6 3.13
 COIL + EE 24.4 5.16
 TGHT  26.5 5.82

Friday, September 14, 2018, 09:55:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 3.99
 TBHT 24.6 3.11
 COIL + EE 24.6 5.12
 TGHT  26.5 5.83

Friday, September 14, 2018, 14:41: Auto-cooling @ 2 A per min.


Monday, September 17, 2018, 09:15: HV to 0. RGA off, IV4 closed & reset

Monday, September 17, 2018, 09:20: Sources off. Turbo pumps & Ion gauge off. Power off.

Monday, September 17, 2018, 09:23: Waterlines purged.

 

Attachment 1: ER-580-230-30kV-M7.txt  3 kB  Uploaded Tuesday, October 02, 2018, 11:07  | Show | Hide all
Attachment 2: ER-580-230-30kV-M38.txt  3 kB  Uploaded Tuesday, October 02, 2018, 11:07  | Show | Hide all
Attachment 3: ER-580-230-30kV-M83.txt  3 kB  Uploaded Tuesday, October 02, 2018, 11:07  | Show | Hide all
Attachment 4: ER-580-230-30kV-M129.txt  3 kB  Uploaded Tuesday, October 02, 2018, 11:07  | Show | Hide all
Attachment 5: ER-580-230-30kV-M130.txt  3 kB  Uploaded Tuesday, October 02, 2018, 11:07  | Show | Hide all
Attachment 6: OMEGA_OM-DAQPRO-5300_17-Sep-18_14.13.36.dlp  909 kB  Uploaded Tuesday, October 02, 2018, 11:07
Attachment 7: TS-2018-09-12-12-50.rga  2.535 MB  Uploaded Tuesday, October 02, 2018, 11:08
Attachment 8: Ta#57.docx  1.779 MB  Uploaded Tuesday, October 02, 2018, 11:24
Attachment 9: ITE-TM4-Ta#57-LP-SIS_Test_Stand.docx  731 kB  Uploaded Tuesday, October 02, 2018, 15:17
ELOG V2.9.2-2455