Message ID: 1009     Entry time: Friday, May 17, 2024, 17:24
Author: Brady Borrmann 
Target/No.#: UC# 
Source: LP-FEBIAD 
Station: ITE 
Module:  
Target Oven W.O#: 44692-4 
Heat Shield W.O#: 45235-18 
Status: In progress 
Subject: Conditioning Spare Development Target 

Friday, May 17, 2024, Spare FEBIAD Development target installed

Friday, May 17, 2024, 17:00: Roughing

Friday, May 17, 2024, 17:38:  TP1B started.

Friday, May 17, 2024, 17:43 TP1B Green. OK.

Friday, May 17, 2024, 17:46 : TP1A on.

Friday, May 17, 2024, 17:54 : TP1A Green. OK.

 Tuesday, May 21, 2024, 09:47 :   TP1A and TP1B switched off. Source tray calibrated leak to be removed.

 Tuesday, May 21, 2024, 10:13 :   VV1 open for venting to atmospheric pressure.

Tuesday, May 21, 2024, 11:26 :  Source tray calibrated leak removed, target calibrated leak connected to gas line. Chamber closed, roughing valves open. Roughing down.

 Tuesday, May 21, 2024, 12:02  TP1B on

Tuesday, May 21, 2024, 12:04: TP1A on. 

 Tuesday, May 21, 2024, 15:12  gradually raising BIAS/EL/EE voltages to 50kV/25kV/2kV.

Tuesday, May 21, 2024, 15:58  increasing BIAS to 50+kV, watching for sparks.

Tuesday, May 21, 2024, 16:38: voltage stable at 55kV. after 10 minutes, of high voltage with no sparks, dropping the voltages to 0V.

Wednesday, May 22, 2024, 11:36:  increasing voltage BIAS/EL/EE to 30kV/15kV/1.5kV.

Wednesday, May 22, 2024, 11:56 gradually increasing COIL to 80A, letting vacuum recover as necessary. 

Wednesday, May 22, 2024, 13:31:  COIL to 90A, recovering vacuum.

 Wednesday, May 22, 2024, 16:58 increasing TGHT TBHT to 440A/290A at 1A/30s. reducing COIL to 0A and voltages to 0V overnight

Thursday, May 23, 2024, 11:14 :  increasing voltage BIAS/EL/EE to 30kV/13kV/1.5kV.

Thursday, May 23, 2024, 11:33:  Sensor on beam line vacuum TMSIG6 not working. reports bad vacuum, despite both TMSTP6 TMSTP2 running at full speed. Likely that vacuum is at appropriate level.

Thursday, May 23, 2024, 11:35: turning on optics and confirming correct tune.  --- cannot do this due to interlock on TP6.  investigating problem. -- switched to filament 2 on control panel

Thursday, May 23, 2024, 13:14:  after setting magnet to argon-40, running degaussing script for coil / anode optimization  - measure_id= 6220.  heat map at bottom. . optimal point at 120V 40A (local maximum)

Thursday, May 23, 2024, 13:45:  allowing vacuum to recover after scan. vacuum during scan was approximately 4e-6 T

Thursday, May 23, 2024, 13:57 running mass scan with gas on -  2024-05-23-14-25 LP FEBIAD backup leak 1.txt

Thursday, May 23, 2024, 14:29 mass scan gas off (purged) - 2024-05-23-15-03 LP FEBIAD backup leak 2.txt

Thursday, May 23, 2024, 15:04   increasing tght tbht to 490A 320A 

Thursday, May 23, 2024, 15:26:  when at TGHT TBHT = 461A/313A, the anode power supply began current limiting (shorted to hvc)

Thursday, May 23, 2024, 15:28  cooling to 460A/310A

Thursday, May 23, 2024, 15:35  cooling to 450A/300A 

 Thursday, May 23, 2024, 15:44  stopped cooling at 455A/305A as the anode became UNshorted.

Thursday, May 23, 2024, 16:19  mass scan with gas off - 2024-05-23-16-18 LP FEBIAD backup leak 3.txt

Thursday, May 23, 2024, 16:21   gas on - mass scan -  2024-05-23-16-51 LP FEBIAD backup leak 4.txt

Thursday, May 23, 2024, 16:52 :  increasing TGHT TBHT again to test anode shorting threshold:  - shorted at: 458A/308A.  then decreased to 450A/300A, did not UNshort until after a few minutes at that current.  shorted when increased to 456/306

Thursday, May 23, 2024, 17:22   decreasing voltages to 0V

 Thursday, May 23, 2024, 11:14 :  increasing voltage BIAS/EL/EE to 30kV/13kV/1.5kV.

 Tuesday, May 28, 2024, 12:59  cooling target to 0A. will remove target to attempt fix on anode short.

 Tuesday, May 28, 2024, 17:17   TGHT TBHT at 0A. TP1A and TP1B off.

 

 

 

 