Message ID: 952     Entry time: Monday, December 19, 2022, 12:49
Author: Carla Babcock 
Target/No.#:  
Source: HP-FEBIAD 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: HP-FEBIAD tests 

Monday, December 19, 2022, 12:06 : Tomislav changed the polarity of the anode power supply last week and everything has been closed up again. The anode wire was switched to feedthru J and the short there removed. Forgot to put the short on the tube before closing the top but it should be ok for these tests since it has the resistor still installed to keep it at some potential. Pumping out gas lines.

Monday, December 19, 2022, 12:46 : Anode voltage ramped to 500V no problems. BIAS\EE\EL at 30kV\-1kV\13kV. Starting heaters ramping to TGHT=600A TBHT=290A.

Tuesday, December 20, 2022, 08:23 : Cancelled heater ramp at 500A yesterday, resuming now.

Wednesday, December 21, 2022, 14:48 : Everything ramped down


Friday, January 06, 2023, 09:27: Turbo pumps off. - AS 