Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 950     Entry time: Tuesday, December 13, 2022, 16:12
Author: Aaron Schmidt 
Target/No.#:  
Source: HP-FEBIAD-CTL 
Station:  
Module:  
Target Oven W.O#: 43104-2 
Heat Shield W.O#: 45235-12 
Status: In progress 
Subject: New anode routed FEBIAD Test - 2 

Thermocouples installed (X):

O - O

O - Anode

O - X

O - X

O - O

Megger check ok. Thermocouples checked with a heat gun ok.

Using CTL FEBIAD for thermocouple access. Gas line running into ion source. Anode is run under the coil w/ source cup modification. No welding. 1mm PE spacer installed. 3 layers of Ta foil added to the HP-FEBIAD-CTL on the center block. Edge fins exposed.

Tuesday, December 13, 2022, 16:10: Roughing.

Tuesday, December 13, 2022, 16:40: TP1 B on.

Tuesday, December 13, 2022, 16:49: TP1 A on.

Tuesday, December 13, 2022, 16:58: IG1 on Vacuum @ 7.00e-05T & dropping.


Wednesday, December 14, 2022, 06:49: Waterline FS#5 opened. Vacuum @ 2.42e-06T.

Wednesday, December 14, 2022, 06:53: Power / Sources / Optics on.

Wednesday, December 14, 2022, 06:54: BIAS / EE / EZL / Anode to 1 / 0.5 1 / 0.1 kV.

Wednesday, December 14, 2022, 06:59: TGHT / TBHT / Coil @ 10 A.

Wednesday, December 14, 2022, 07:19: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, December 14, 2022, 07:21: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. 

Wednesday, December 14, 2022, 07:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Wednesday, December 14, 2022, 07:47: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.

Wednesday, December 14, 2022, 07:49: Auto-ramping TGHT / TBHT to 25 / 25 A @ 2 A per min

Wednesday, December 14, 2022, 07:52: IV4 open.

Wednesday, December 14, 2022, 08:01: Auto-ramping TGHT / TBHT to 50 / 50 A @ 2 A per min

Wednesday, December 14, 2022, 09:05: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min

Wednesday, December 14, 2022, 09:49 : Auto-ramping TGHT & TBHT to 200 A & 100 A @ 2A er min

Wednesday, December 14, 2022, 10:49 :Auto-ramping TGHT & TBHT to 220 A & 120 A @ 2A er min

Wednesday, December 14, 2022, 11:05 :Auto-ramping TGHT & TBHT to 240 A & 140 A @ 2A er min

Wednesday, December 14, 2022, 11:19 :Auto-ramping TGHT & TBHT to 260 A & 160 A @ 2A er min

Wednesday, December 14, 2022, 11:33 :Auto-ramping TGHT & TBHT to 280 A & 180 A @ 2A er min

Wednesday, December 14, 2022, 11:48 :Auto-ramping TGHT & TBHT to 300 A & 200 A @ 2A er min

Wednesday, December 14, 2022, 12:05 :Auto-ramping TGHT & TBHT to 320 A & 220 A @ 2A er min

Wednesday, December 14, 2022, 12:29: Auto-ramping TGHT & TBHT to 340 A & 240 A @ 2A er min

Wednesday, December 14, 2022, 13:08 : Auto-ramping TGHT & TBHT to 360 A & 260 A @ 2A er min

Wednesday, December 14, 2022, 13:14 : Pyrometer reading shows up after adjustment in focussing

Wednesday, December 14, 2022, 13:22 : Auto-ramping TGHT & TBHT to 380 A & 270 A @ 2A er min

Wednesday, December 14, 2022, 13:35 : Auto-ramping TGHT to 400 A @ 2A per min

Wednesday, December 14, 2022, 13:49: Auto-ramping TGHT to 420 A @ 2 A per min.

Wednesday, December 14, 2022, 14:01: Auto-ramping TGHT to 440 A @ 2 A per min.

Wednesday, December 14, 2022, 14:16: Auto-ramping TGHT to 460 A @ 2 A per min.

Wednesday, December 14, 2022, 14:31: Auto-ramping TGHT to 480 A @ 2 A per min.

Wednesday, December 14, 2022, 14:44: Auto-ramping TGHT to 500 A @ 2 A per min.

Wednesday, December 14, 2022, 14:56: Auto-ramping TGHT to 520 A @ 2 A per min.

Wednesday, December 14, 2022, 15:08: Auto-ramping TGHT to 540 A @ 2 A per min.

Wednesday, December 14, 2022, 15:21: Auto-ramping TGHT to 560 A @ 2 A per min.

Wednesday, December 14, 2022, 15:35 : Auto-ramping TGHT & TBHT to 580 A & 290 A @ 2A er min

Wednesday, December 14, 2022, 16:08 : Auto-ramping TGHT to 600 A @ 2 A per min.

Thursday, December 15, 2022, 10:00 : Auto-ramping TBHT to 300 A @ 2 A per min.

Thursday, December 15, 2022, 13:19 : Auto-ramping TBHT to 330 A @ 2 A per min.

Thursday, December 15, 2022, 14:25 : Increased anode voltage to 400 V.

Thursday, December 15, 2022, 14:50: Reducing TGHT & TBHT to 0 A @ 2 A per min.

Thursday, December 15, 2022, 14:59 : Ramped down anode voltage to 0 V & coil current to 0 A.


Friday, December 16, 2022, 06:59: IV4 & power off. 

Friday, December 16, 2022, 07:01: IG1 off. Turbo pumps off.

Friday, December 16, 2022, 08:15: Venting.

 

 

Attachment 1: Re-routed_Anode_FEBIAD_12-2022_Test_2.docx  310 kB  Uploaded Friday, December 16, 2022, 08:17
ELOG V2.9.2-2455