Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 556     Entry time: Wednesday, November 30, 2016, 07:25
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Camera Container test 3. 

Wednesday, November 30, 2016, 07:23: Venting

Wednesday, November 30, 2016, 08:35: Roughing.

Wednesday, November 30, 2016, 09:01: RGA on. Turbos @ speed. Ion gauge on.

Wednesday, November 30, 2016, 09:35: RGA off. Ion gauge off. Turbo pumps off.

Wednesday, November 30, 2016, 09:47: Turbo pumps were internally vented. Venting continued.

Attachment 1: Camera_Case_Test_3.docx  440 kB  Uploaded Wednesday, November 30, 2016, 10:14
Attachment 2: TS-2016-11-30-09-00_Test_3.rga  22 kB  Uploaded Wednesday, November 30, 2016, 10:14
ELOG V2.9.2-2455