Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 787     Entry time: Monday, March 02, 2020, 14:42
Author: Aaron Schmidt 
Target/No.#: Ta#60 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 44139-13 
Heat Shield W.O#: 43515-5 
Status: In progress 
Subject: Full TS testing w/ HV using Ta#60 

Monday, March 02, 2020, 14:36: Roughing.

Monday, March 02, 2020, 15:08: Turbo pumps on.


Remove HV cage (top). Reroute FS#3 back to cool EE

Tuesday, March 03, 2020, 08:11: Waterlines open. Vacuum ok @ 6.52e-07T.

HV cage top on. Data Logger removed. Wiring grounded.

Tuesday, March 03, 2020, 09:00: Power / sources / HV on.

Tuesday, March 03, 2020, 09:03: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.65 4.38
 TBHT 25.50

6.97

 COIL + EE 25.39 1.06
 TGHT 25.82 5.84

Tuesday, March 03, 2020, 09:08: BIAS / EE / EZL on.

Tuesday, March 03, 2020, 09:11: BIAS / EE / EZL @ 10 / 7.5 / -1 kV.

Tuesday, March 03, 2020, 09:15: BIAS / EE / EZL @ 20 / 12.5 / -1.5 kV. Read back on PS same / ok.

Tuesday, March 03, 2020, 09:17: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

Tuesday, March 03, 2020, 09:18: IV4 Opened.

Tuesday, March 03, 2020, 09:24: Optics on / set.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 11:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

FM

Tuesday, March 03, 2020, 18:30: BIAS/EE/EZL @ 0 kV.

Tuesday, March 03, 2020, 18:31: TGHT / TBHT to 400 / 200 A @ 4 A per min.

Nothing observed on the emittance scan regardless of the tune


Wednesday, March 04, 2020, 09:09:  Auto-ramping TGHT / TBHT to 500 / 210 A @ 4 A per min. 

Wednesday, March 04, 2020, 10:47:  Auto-ramping TGHT / TBHT to 580/ 230 A @ 4 A per min. 

*Got busy in the morning, starting later than expected

Wednesday, March 04, 2020, 13:47: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

*Seminar at 2:30 I'll continue later

Wednesday, March 04, 2020, 16:08: Emittance rig troubleshoot (see e-log 778)

Wednesday, March 04, 2020, 19:00: BIAS/EE/EZL @ 0 kV.

Wednesday, March 04, 2020, 19:09: TBHT to 200A to try preserver some salts for tomorrow tests


Friday, March 06, 2020, 17:50: Auto-cooling 4 A/min .


Monday, March 09, 2020, 12:08: IV4 closed

Monday, March 09, 2020, 12:08: IG1 Off.

Monday, March 09, 2020, 12:09: Turbos off

Monday, March 09, 2020, 16:19: Venting

ELOG V2.9.2-2455