Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 17     Entry time: Friday, September 30, 2011, 18:03
Author: Aurelia Laxdal 
Target/No.#: SiC#26 
Source: HP-FEBIAD 
Station: ITE 
Module: TM4 
Target Oven W.O#: 38295-9 
Heat Shield W.O#: 38307-8 
Status: Done 
Subject: Finished testing SiC#26 at the Test Stand 

Today, did a did a mass scan: plotdump-local-clean.txt Sep30 11 12-20-08.txt

Optimized a bit the tune with Friedhelm, then started the Target Cooldown.

ELOG V2.9.2-2455