Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Entry  Wednesday, January 29, 2014, 14:42, Anders Mjos, , , , , , , Problems/Solutions, Valved off water to TSG and TMS:MB1 
    Reply  Thursday, January 30, 2014, 15:38, Anders Mjos, , , , , , , Problems/Solutions, Starting turbos after CuLCW shut off 
Message ID: 358     Entry time: Thursday, January 30, 2014, 15:38     In reply to: 357
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: Starting turbos after CuLCW shut off 

Anders Mjos wrote:

CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off.

Opened up for water flow.

Thursday, January 30, 2014, 15:30: Started turbos

Thursday, January 30, 2014, 15:34: TP2 and TP6 at speed. Vacuum at 2.5E-5 T

Thursday, January 30, 2014, 15:34: TP1B at speed. Vacuum at 1.3E-5 T

Thursday, January 30, 2014, 15:38: TP1A at speed. Vacuum at 1.6E-6 T

ELOG V2.9.2-2455