Message ID: 813     Entry time: Tuesday, September 29, 2020, 11:56
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Problems/Solutions 
Subject: Leak check 3.0 

Installed Indium gasket on FS#2 - (C) water block / R- TGHT.

Tuesday, September 29, 2020, 11:23: Pressurize to 120 PSI at atmosphere.

LD: 0.0E-07 atm-CC/sec

Tuesday, September 29, 2020, 11:30: LD: 0.0E-07 atm-CC/sec checked & held on gasket / water block (C) for min minutes. No LD response.

Tuesday, September 29, 2020, 11:56: Roughing.

Tuesday, September 29, 2020, 12:28: TP1B on.

Tuesday, September 29, 2020, 13:10: TP1A on. IG1 on.

Tuesday, September 29, 2020, 16:10: Vacuum @ 8.66e-06T.

Tuesday, September 29, 2020, 16:13: FS#2 opened. Vacuum @ 8.48e-06T.

Tuesday, September 29, 2020, 16:23: Opened FS#5. Vacuum ok

Tuesday, September 29, 2020, 16:25: Opened FS#4. Vacuum ok

Tuesday, September 29, 2020, 16:27: Opened FS#3 Vacuum ok @ 8.13e-06T.

 