Message ID: 781     Entry time: Thursday, January 30, 2020, 15:25
Author: Aaron Schmidt 
Target/No.#: C(#1) 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 43044-8 
Heat Shield W.O#: 43515-3 
Status: In progress 
Subject: Conditioning C(#1) HS 

Was for UC# 32* - Schedule change, now for C#1

Thursday, January 30, 2020, 15:13: Roughing.

Thursday, January 30, 2020, 15:46: Turbo pumps on.

 Thursday, January 30, 2020, 15:50: IG1 on.


Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.

Friday, January 31, 2020, 08:16: Power / sources on

Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min. 


Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.


Friday, February 07, 2020, 11:45:

Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd.

Attachment 1: C#1_-_Short.docx  230 kB  Uploaded Friday, March 13, 2020, 09:43