Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 1001     Entry time: Tuesday, April 09, 2024, 15:28
Author: Aaron Schmidt 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Set to Anode BIAS Mode & Old gas leak installed. 

Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed.

ELOG V2.9.2-2455