Message ID: 824     Entry time: Wednesday, December 02, 2020, 08:32
Author: Carla Babcock 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Modifications to test stand for TM3 tests 

Wednesday, December 02, 2020, 08:31 :

Added copper wire connection to multipin screw terminals in HV cage to make sure they are grounded.

Attached grounding rod to back of HV cage. Not ideal, but couldn't find a better place without making a extension to the cable. Will see what John Chow says. EDIT: John says it is ok for the tests, not for permanent.

Vented test stand to swap window positions. Swapped rightmost window on the door with two windows with window on the door with only one window. Replaced one oring, that on the single window. Cleaned the inside surfaces of both windows with methanol before re-installing. Roughing down just to make sure there are no major issues, at 0.313T and falling. EDIT: down to 0.015T overnight.

All breakers on HV cage panel are OFF.