Message ID: 966     Entry time: Tuesday, May 09, 2023, 10:40
Author: Aaron Schmidt 
Target/No.#: SiC#45 
Source: HP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 44692-3 
Heat Shield W.O#: 45235-8 
Status: In progress 
Subject: Conditioning SiC#45 

Tuesday, May 09, 2023, 10:28: Roughing.

Tuesday, May 09, 2023, 11:25: TP1B on. 

Tuesday, May 09, 2023, 12:38: TP1A on.

Tuesday, May 09, 2023, 12:49: IG1 on. 


Wednesday, May 10, 2023, 10:41: Waterline FS#5 opened. Vacuum @6.36e-07T

Wednesday, May 10, 2023, 10:56: IV4 open. Power / sources / optics on. 

Wednesday, May 10, 2023, 10:59: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 / 1 A per minute. 

Wednesday, May 10, 2023, 11:09: BIAS / EE / EZL @ 10 / -1.0 / 5 kV. 

Wednesday, May 10, 2023, 11:54: Vacuum climbing quickly @ 4.10e-06T. Halt ramping to stabilize. TGHT / TBHT @ 100 / 50 A.

Wednesday, May 10, 2023, 11:59: Vacuum @ 7.69e-06T & still climbing. 

Wednesday, May 10, 2023, 12:05: Levelled off @ 8.91e-06T. 

Wednesday, May 10, 2023, 13:16: Vacuum @ 2.04e-06T. Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 / 1 A per minute.

Wednesday, May 10, 2023, 13:34: Abort ramping. 

Wednesday, May 10, 2023, 13:52: Vacuum @ 4.35e-06T. Restart auto-ramping TGHT / TBHT to 200 / 100 A @ 1 A per minute.

Wednesday, May 10, 2023, 15:43: Vacuum @ 1.05e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per minute.  

Wednesday, May 10, 2023, 16:36: Vacuum @ 8.23e-07T. TGHT  / TBHT @ 250 A / 150 A. Auto-ramping TGHT / TBHT to 450 / 250 A @ 2 / 1 A per minute.  

Wednesday, May 10, 2023, 20:52: Vacuum @ 5.01e-06T. TGHT / TBHT Slowly ramping due to vacuum limit being reached. 


Thursday, May 11, 2023, 05:42: TBHT reduced @ 230 A. Auto-ramping TGHT to 580 A @ 2 A per min 

Thursday, May 11, 2023, 05:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, May 11, 2023, 09:30: Mass & wire scans complete.


Friday, May 12, 2023, 07:21: Auto-cooling @ 1 A per min.

Friday, May 12, 2023, 11:54: HV to 0 kV. 


Tuesday, May 16, 2023, 11:03: IV4 closed. Power / Sources off. Locked out.

Tuesday, May 16, 2023, 11:04: IG1 & IG6 off. All turbo pumps off.

Tuesday, May 16, 2023, 12:19: Venting.

 

Attachment 1: SiC#45_Conditioning..docx  825 kB  Uploaded Wednesday, August 16, 2023, 10:57
ELOG V2.9.2-2455