Message ID: 354     Entry time: Tuesday, January 14, 2014, 08:58
Author: Anders Mjos 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#: 40282-5 
Heat Shield W.O#: 39230-1 
Status: Done 
Subject: Heating Test 

Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T

Tuesday, January 14, 2014, 13:32: Venting 

Ta-tube installed. All bolts torqued to 130 in lbs

Thermocouples installed. CH2/3 left/right swapped with respect to previous test.

CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe right side - type C
CH3 6/7: inside probe left side - type C
CH4 8/9: welded on leg - type K

Tuesday, January 14, 2014, 15:10: Roughing 
Tuesday, January 14, 2014, 15:33: Starting turbos.
Tuesday, January 14, 2014, 15:42: Turbos at speed
Tuesday, January 14, 2014, 15:43: Vacuum at  2.3E-5 T


Wednesday, January 15, 2014, 10:32: Opened water. Vacuum stable at 2.9E-7 T.


Monday, January 20, 2014

Started heating the Target-tube. 

Pressure increase observed on water supply around 10. Supply ~100psi, return ~7 psi


Tuesday, January 21, 2014

Continue heating from 250 A

Tuesday, January 21, 2014, 15:47: TGHT at 580 A, 7.23 V


Wednesday, January 22, 2014

Target-tube cooled down over night. Will went to investigate TC connections.

Wednesday, January 22, 2014, 08:38 : Turbos stopped. Vacuum at 1.3E-7 T