Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 859     Entry time: Monday, March 01, 2021, 16:13
Author: Fernando Maldonado 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Done 
Subject: Temporary RGA installation 

 Monday, March 01, 2021, 16:03: An ExTorr RGA has been installed in the ISAC test stand.

The original SRS 100 is still broken ( e-log 778)

The SRS 100 from the conditioning station will not be available this week.

Attachment 1: EXTorr.PNG  1.131 MB  | Show | Hide all
ELOG V2.9.2-2455