Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 572     Entry time: Friday, March 10, 2017, 15:42
Author: Aaron Schmidt 
Target/No.#: UC#19 
Source:  
Station:  
Module:  
Target Oven W.O#: 41882-4 
Heat Shield W.O#: 41751-2 
Status: In progress 
Subject: Conditioning Heat shield for UC#19 

Friday, March 10, 2017, 15:40: Roughing.

Friday, March 10, 2017, 15:58: Turbo pumps started.

Friday, March 10, 2017, 16:19: Ion gauge on.

Friday, March 10, 2017, 16:22: RGA on.


Monday, March 13, 2017, 09:20: Water lines opened. No response on RGA. Vacuum @ 1.99e-07T

Monday, March 13, 2017, 09:38: Power/sources on

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.6 3.84
 TBHT 24.4 3.00
 COIL + EE 24.4 4.89
 TGHT  24.6 5.56

Monday, March 13, 2017, 09:42: Auto ramping TGHT to 580A @ 2A per min.

Monday, March 13, 2017, 11:58: Water: 95 PSI on Supply. 10 PSI on Return.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.1 3.82
 TBHT 26.3 3.20
 COIL + EE 24.7 4.95
 TGHT  25.4 5.56

 


Tuesday, March 14, 2017, 08:55: Vacuum @ 3.26e-07T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 34.0 3.85
 TBHT 25.9 3.11
 COIL + EE 24.9 4.98
 TGHT  26.8 5.57

Tuesday, March 14, 2017, 15:54:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 34.1 3.82
 TBHT 25.2 3.07
 COIL + EE 25.0 4.94
 TGHT  27.1 5.58

Tuesday, March 14, 2017, 15:55: Auto-cooling started @ 2A per min


Tuesday, March 21, 2017, 09:30: Power/Sources off.

Tuesday, March 21, 2017, 14:11: RGA off

Tuesday, March 21, 2017, 14:13: Ion gauge & Turbo pumps off.


by Anders

Wednesday, March 22, 2017, 08:47: Venting

Wednesday, March 22, 2017, 09:3: HS removed

Attachment 1: TS-2017-03-10-16-20.rga  7.899 MB  Uploaded Wednesday, March 22, 2017, 10:06
Attachment 2: OMEGA_OM-DAQPRO-5300_22-Mar-17_09.05.23.dlp  1.578 MB  Uploaded Wednesday, March 22, 2017, 10:07
ELOG V2.9.2-2455