Wires reconfigured / set
Wednesday, August 22, 2018, 13:10: Roughing.
Wednesday, August 22, 2018, 15:18: Turbo Pumps on.
Thursday, August 23, 2018, 08:16: RGA On.
Thursday, August 23, 2018, 08:39: Power on. Waterlines opened. No response on RGA, Vacuum ok @7.25e-06T
Monday, August 27, 2018, 09:50: Venting.
Monday, August 27, 2018, 10:59: Ta foil removed from one end plate. Roughing.
Monday, August 27, 2018, 11:29: Turbo pumps started.
Monday, August 27, 2018, 11:36: Ion gauge on. Both Turbo pumps at speed.
Tuesday, August 28, 2018, 08:27: Power on
Tuesday, August 28, 2018, 08:30: Waterlines opened. Vacuum ok @ 9.31e-07T. No response on RGA.
Wednesday, August 29, 2018, 11:34: Epics crashed. See added elog.
Friday, August 31, 2018, 10:07: Voltage tests are complete. Results to be uploaded later.
RGA crashed. Unable to re-connect. Manually turned it off.
Friday, August 31, 2018, 10:14: Ion gauge & turbo pumps off.
Friday, August 31, 2018, 11:27: Venting.
|