Anders Mjos wrote: |
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed
|
The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.
Tuesday, June 17, 2014, 15:22: Roughing
By R.M.
Tuesday, June 17, 2014, 15:52: Turbos Started
Tuesday, June 17, 2014, 15:54: TP1B at speed
Tuesday, June 17, 2014, 15:57: IG1 Turned on 1.92e-05T
Tuesday, June 17, 2014, 15:59: TP1A at speed
Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T
By AM
Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.
Wednesday, June 18, 2014, 08:40: Pumping on gas lines.
Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.
Wednesday, June 18, 2014, 08:51: Opening TSH:SV5
Wednesday, June 18, 2014, 08:53: Opening TSH:SV2
Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV
Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A
Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V
Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4
Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)
Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V
Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A
Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A
Thursday, June 19, 2014, 09:44: 8E-8 A on FC0
Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.
Thursday, June 19, 2014, 11:36: Opening for He.
Thursday, June 19, 2014, 11:46: Opening for Ne.
Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A
Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.
Thursday, June 19, 2014, 15:06: Mass scan up.
Thursday, June 19, 2014, 16:00: Mass scan down.
Thursday, June 19, 2014, 16:49: Started cooling down target.
Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.
Friday, June 20, 2014, 10:23: Venting. Purging water from HS circuit. |