Ceramic elbow installed on the anode.
Friday, May 05, 2023, 06:47: Roughing.
Friday, May 05, 2023, 07:24: TP1B on.
Friday, May 05, 2023, 07:34: TP1A on.
Friday, May 05, 2023, 07:43: IG1 on.
Friday, May 05, 2023, 12:12: Vacuum @ 6.91e-06T. FS#5 opened. Vacuum stable.
Friday, May 05, 2023, 12:16: Power/sources on. Gases set
Friday, May 05, 2023, 12:19: Optics on / set.
Friday, May 05, 2023, 12:21: Quick System ready check - OK. Manually set.
TGHT / TBHT @ 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Anode @ 100 V - 7.326mA
Coil @ 10 A.
Friday, May 05, 2023, 12:23: Ready for operation. All sources back to 0 A / 0 V. Optics remain. Vacuum continues down @ 6.70e-06T.
Monday, May 08, 2023, 08:21: IV4 open.
Monday, May 08, 2023, 08:25: Tap up Anode in steps @ 20 v per 20 seconds.
Anode @ 100 V = 4.884 mA
Anode @ 200 V = 6.105 mA
Anode @ 300 V = 7.326 mA
Anode @ 400 V = 7.326 mA
Monday, May 08, 2023, 08:42: Anode tapped down to 20 V.
Monday, May 08, 2023, 08:52: Coil tapped up to 70 A @ 7 A per minute.
Monday, May 08, 2023, 09:12: Coil tapped back down to 0 A @ 7 A per minute.
Monday, May 08, 2023, 09:15: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 / 1 A per min.
Monday, May 08, 2023, 09:20: BIAS / EE / EZL set to 10 / -1.0 / 5 kV.
Monday, May 08, 2023, 14:37: TGHT / TBHT @ 580 / 290 A. BIAS / EE / EZL set to 30 / -1.5 / 13 kV.
Monday, May 08, 2023, 14:38: Anode tapped up to 100 V @ 20 V per 20 seconds. Begin mass & wire scans.
Monday, May 08, 2023, 15:01: Mass & wire scans complete.
Monday, May 08, 2023, 18:59: Tap up Anode in steps @ 20 v per 20 seconds from 100 V.
Anode @ 100 V = 9.768 mA
Anode @ 200 V = 12.210 mA
Anode @ 300 V = 14.652 mA
Monday, May 08, 2023, 19:05: Anode @ 400 V = 17.094 mA
Monday, May 08, 2023, 19:18: Anode tapped down to 20 V.
Monday, May 08, 2023, 19:24: BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Monday, May 08, 2023, 19:35: Coil tapped up to 70 A @ 7 A per minute.
Monday, May 08, 2023, 19:49: Coil tapped back down to 0 A @ 7 A per minute. Vacuum rose to 6.20e-06T @ 70A. Stabilized back down around 2.24e-06T.
Monday, May 08, 2023, 19:53: Auto-cooling @ 1 A per minute.
Tuesday, May 09, 2023, 06:59: Anode, & HV sources to 0 V. IV4 closed.
Tuesday, May 09, 2023, 07:35: SV5 closed. Power / sources off.
Tuesday, May 09, 2023, 07:38: IG1 off. TP1B & TP1A off.
Tuesday, May 09, 2023, 08:49: Venting. |