Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 229     Entry time: Monday, November 05, 2012, 09:47
Author: Aurelia Laxdal 
Target/No.#:  
Source: LP-SIS 
Station: ITW 
Module: TM1 
Target Oven W.O#:  
Heat Shield W.O#:  
Status: Done 
Subject: TPS optics cannot be turned off.  

All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.

Same for the TSG optics: CB1, VCB1 and CBC.

Talked to Evgeniy and Kazuya. Optics are OFF now.

ELOG V2.9.2-2455