Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.
Monday, November 04, 2024, 11:40: Vent beamline.
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.
Monday, November 04, 2024, 13:51: TMS:TP2 on.
Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.
Tuesday, November 05, 2024, 15:00: Venting Chamber
Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi,
Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T.
Wednesday, November 13, 2024, 09:16: IG6 is tripped again.
Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T. |