Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 160     Entry time: Friday, August 10, 2012, 15:29
Author: Pierre Bricault 
Target/No.#: NA 
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: NA 
Heat Shield W.O#: NA 
Status:  
Subject: finishing the gas installation and its pump 

1524H Start small pump.

1529H stop the pump.

 

ELOG V2.9.2-2455