Message ID: 967     Entry time: Tuesday, May 16, 2023, 14:00
Author: Aaron Schmidt 
Target/No.#: Ta#65 
Source: LP-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 45220-7 
Heat Shield W.O#: 45235-2 
Status: In progress 
Subject: Conditioning Ta#65 

Calibrated window installed on the beam line.

Tuesday, May 16, 2023, 13:45: Roughing both the chamber & beam line.

Tuesday, May 16, 2023, 14:00: TMS:TP6 on.

Tuesday, May 16, 2023, 14:04: TMS:TP2 on.

Tuesday, May 16, 2023, 14:13: IG6 on.

Tuesday, May 16, 2023, 14:17: TSG:TP1B on.

Tuesday, May 16, 2023, 14:23: TSG:TP1A on.

Tuesday, May 16, 2023, 14:33: IG1 on.


Tuesday, May 23, 2023, 07:30: Waterline FS#5 open. Vacuum stable @ 2.78e-07T

Tuesday, May 23, 2023, 07:32: Power / Sources on.

Tuesday, May 23, 2023, 07:35: Auto-ramping TGHT / TBHT to 230 A / 230 A @ 2 A per min. IV4 open.

Tuesday, May 23, 2023, 07:38: Optics are set.

Tuesday, May 23, 2023, 11:38: Auto-ramping TGHT to 300 A @ 2 A per minute.  

Tuesday, May 23, 2023, 12:32: Auto-ramping TGHT to 350 A @ 2 A per minute. 

Tuesday, May 23, 2023, 13:13: Auto-ramping TGHT to 400 A @ 2 A per minute. 

Tuesday, May 23, 2023, 14:00: Auto-ramping TGHT to 450 A @ 2 A per minute.

Tuesday, May 23, 2023, 14:50: Auto-ramping TGHT to 500 A @ 2 A per minute.

Tuesday, May 23, 2023, 16:07: Auto-ramping TGHT to 550 A @ 2 A per minute.

Tuesday, May 23, 2023, 16:51: Auto-ramping TGHT to 580 A @ 2 A per minute.

Tuesday, May 23, 2023, 17:35: TGHT at 580A with TBHT at 230A.

Tuesday, May 23, 2023, 21:37: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Begin wire & mass scans.

Tuesday, May 23, 2023, 22:03: Mass & wire scans complete. 

Tuesday, May 23, 2023, 22:09: BIAS / EE / EZL @ 0 kV.  


Wednesday, May 24, 2023, 13:48: Auto-ramping TGHT to 550 A and TBHT to 200A @ 2 A per minute.

Currently at TGHT to 500 A and  TBHT to 150A. 15:44 pm

Wednesday, May 24, 2023, 15:44: Auto-ramping TGHT to 450 A and TBHT to 100A @ 2 A per minute.

Wednesday, May 24, 2023, 17:22: Auto-ramping TGHT to 400 A and TBHT to 50A @ 2 A per minute.


Thursday, May 25, 2023, 07:49: TGHT / TBHT @ 0A (Reached before midnight - But not logged). IV4 closed. 

Thursday, May 25, 2023, 09:04: Power / Sources off.

Thursday, May 25, 2023, 09:06: IG1 off. TP1B & TP1A off.

 