Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 777     Entry time: Tuesday, January 21, 2020, 09:38
Author: Aaron Schmidt 
Target/No.#: SiC#40 
Source: LP-SIS 
Station:  
Module:  
Target Oven W.O#: 43044-8 
Heat Shield W.O#: 43515-8 
Status: In progress 
Subject: Conditioning SiC#40 HS 

Was intended for UC#31 - Now used for SiC#40*

PEEK SEAL Test piece attached.

Tuesday, January 21, 2020, 09:34: BV1A open Roughing.

Tuesday, January 21, 2020, 09:38: BV1B open.

Tuesday, January 21, 2020, 10:05: Turbo pumps on.

Tuesday, January 21, 2020, 10:10: Ion gauge on.


Monday, January 27, 2020, 07:07: PS / Sources on. Waterlines already opened.

Monday, January 27, 2020, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Tuesday, January 28, 2020, 14:45: Auto-Cooling @ 2 A per min.


Thursday, January 30, 2020, 11:31: PS / Source off.

Thursday, January 30, 2020, 11:33: IG1 off. Turbos off.

Thursday, January 30, 2020, 13:00: Venting.

Attachment 1: SiC#40.docx  210 kB  Uploaded Friday, March 13, 2020, 09:43
Attachment 2: SiC#40_-_HS_Out_gassing.docx  210 kB  Uploaded Tuesday, May 19, 2020, 11:51
Attachment 3: TS-2020-01-21-11-10.rga  751 kB  Uploaded Tuesday, May 19, 2020, 11:52
ELOG V2.9.2-2455