Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 594     Entry time: Friday, June 30, 2017, 13:31
Author: Aaron Schmidt 
Target/No.#: Ta#53 
Source: HP-SIS 
Station: ITW 
Module: TM2 
Target Oven W.O#: 42218-6 
Heat Shield W.O#: 41751-6 
Status: In progress 
Subject: Conditioning Ta#53  

Friday, June 30, 2017, 13:48: Roughing.

Friday, June 30, 2017, 14:26: Turbo pumps on.

Friday, June 30, 2017, 14:31: Ion gauge on.


Tuesday, July 04, 2017, 07:47: Waterlines opened. No response on RGA. Vacuum @1.35e-07T.

Tuesday, July 04, 2017, 07:51: Power/sources on.

Tuesday, July 04, 2017, 08:01: BIAS / EZL / EE @ 20 / 13 / 1.5 kV .

Tuesday, July 04, 2017, 08:02: IV4 Opened.

Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.2 3.78
 TBHT 26.1 2.99
 COIL + EE 25.8 4.87
 TGHT  26.0 5.48

***Halted to bring in spare target for Ta#52.***


Thursday, July 06, 2017, 09:20: Power/sources off

Thursday, July 06, 2017, 09:24: IV4 closed. Timeout error. Fixed. RGA off

Thursday, July 06, 2017, 09:27: Waterlines purged.

Thursday, July 06, 2017, 09:29: Ion gauge off. Turbos off.

Thursday, July 06, 2017, 13:14: Venting.

***Halted to bring in spare target for Ta#52.***

Attachment 1: Ta#53.docx  402 kB  Uploaded Thursday, July 06, 2017, 10:31
Attachment 2: TS-2017-06-30-14-35.rga  4.210 MB  Uploaded Thursday, July 06, 2017, 10:31
ELOG V2.9.2-2455