Message ID: 308     Entry time: Wednesday, May 29, 2013, 12:10
Author: Anders Mjos 
Target/No.#: CTL FEBIAD 
Source: HP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: 38481-5 
Heat Shield W.O#:  
Status: Done 
Subject: CTL Test 

Wednesday, May 29, 2013, 12:09: Debiased to insert temp logger

Wednesday, May 29, 2013, 14:40: Temp logger installed

CH1 COIL
CH2 CTL Block

Wednesday, May 29, 2013, 14:51: Opening gas lines

Temperatures [deg C]
COIL: 190
CTL:   44

Wednesday, May 29, 2013, 15:31: Coil at 50A

Temperatures [deg C]
COIL: 212
CTL:   45


Thursday, May 30, 2013, 09:18: TGHT was voltage limited at about 570A. Increased voltage limit to 5.5V and raised current to 580A

Thursday, May 30, 2013, 09:20: Ramping TBHT to 280A

Thursday, May 30, 2013, 10:03

Temperatures [deg C]
COIL: 227
CTL:   48

Thursday, May 30, 2013, 10:07: Heard a noise from the vacuum chamber coinciding with a spike in vacuum on both gauges.


Monday, June 03, 2013, 08:54: Target debiased and gases off. Target cooling started in preparation for power outage tomorrow at 9am.


Wednesday, June 05, 2013, 09:57: Purging gas lines to vacuum chamber

Wednesday, June 05, 2013, 10:13: Target biased again. Started target heating.


Thursday, June 06, 2013, 13:23:

Temperatures [deg C]
COIL: 227
CTL:   48

Thursday, June 06, 2013, 16:45: TBHT increased ti 290A

Temperatures [deg C]
COIL: 230
CTL:   50


Friday, June 07, 2013, 08:40: Magnet found off. TPS:Q4 and TPS:Q2 found off.

Temperatures [deg C]
COIL: 227
CTL:   48

Friday, June 07, 2013, 14:21: Anode current limit increased to 500 mA. Adjusted magnet current. Increasing TBHT.

Friday, June 07, 2013, 16:24: TBHT at 296A

Temperatures [deg C]
COIL: 237
CTL:   50


Monday, June 10, 2013, 08:19 

Temperatures [deg C]
COIL: 232
CTL:   49

Monday, June 10, 2013, 16:55: COIL at 60A

Temperatures [deg C]
COIL: 244
CTL:   49


Tuesday, June 11, 2013, 08:42: TBHT voltage limited this morning at 291A

Temperatures [deg C]
COIL: 242
CTL:   49

Tuesday, June 11, 2013, 11:02: COIL at 70A

Temperatures [deg C]
COIL: 256
CTL:   49

Tuesday, June 11, 2013, 15:49: COIL at 80A

Temperatures [deg C]
COIL: 272
CTL:   49


Wednesday, June 12, 2013, 08:19:
 Short on TBHT - see attached photo.
T/C logger is is off.
Gas lines closed.
Cooling down target.
Target debiased.


Thursday, June 13, 2013, 08:37: Turbos stopped.

Thursday, June 13, 2013, 09:20: Water lines purged.

Thursday, June 13, 2013, 09:41: Venting

Thursday, June 13, 2013, 10:19: Target removed

Attachment 1: Photo_2013-06-13_10_33_42_AM.jpg  1.809 MB  Uploaded Friday, June 14, 2013, 16:54  | Show | Hide all