Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 910     Entry time: Wednesday, January 05, 2022, 15:12
Author: Carla Babcock 
Target/No.#:  
Source:  
Station:  
Module:  
Target Oven W.O#:  
Heat Shield W.O#:  
Status:  
Subject: Modifications to test stand for mass marker tests 

Connection of TBHT negative to HV common removed (R4 in circuit diagram). Labelled and put in MRO bucket.

Anode connection moved to feedthrough J.

Rewired multipin patch panel. Left some grounded (HVC) wires hanging, should probably make this nice later.

ELOG V2.9.2-2455