HS line is looped. Cu-test bars installed on TGHT and TBHT. Torqued all bolts to 120 in lbs.
Tuesday, October 15, 2013, 16:17: Roughing
Tuesday, October 15, 2013, 16:39: Turbos started.
Tuesday, October 15, 2013, 16:48: Turbos at speed
Tuesday, October 15, 2013, 16:49: Vacuum at 3.0 E-5 T
Wednesday, October 16, 2013, 08:38: Opened water on HS. Vacuum stable at 5.5E-7 T.
Wednesday, October 16, 2013, 10:12: TBHT to 300A (0.623V) TGHT to 580A (1.443 V)
Wednesday, October 16, 2013, 10:13: Ramping down at 6A/min
Thursday, October 17, 2013, 08:33: Turbos stopped. Vacuum at 2.6E-7 T.
Thursday, October 17, 2013, 10:24: Venting
Turned TGHT Cu-bar 180 deg. Loosened and re-fastened all bolts to 120 in lbs.
Thursday, October 17, 2013, 10:48: Roughing.
Thursday, October 17, 2013, 11:07: Turbos started.
Thursday, October 17, 2013, 11:16: Turbos at speed.
Thursday, October 17, 2013, 11:17: Vacuum at 1.2E-5 T
TGHT and TBHT were brought up to 580A and 300A.
Flow meters connected.
TGHT
T 27.8
Q 5.5
Monday, October 21, 2013, 13:34: Heating TGHT to 580A (1.411 V)
Monday, October 21, 2013, 13:37
TGHT
T 28.9
Q 5.4
Monday, October 21, 2013, 13:40
TGHT
T 29.1
Q 5.5
Monday, October 21, 2013, 13:45
TGHT
T 29.4
Q 5.4
TGHT RDCUR/VOL 581.5A / 1.421 V
Monday, October 21, 2013, 13:47
TGHT RDCUR/VOL 270.6 A / 0.674V
T 28.4
Q 5.4
Monday, October 21, 2013, 13:52
TGHT RDCUR/VOL 270.6 A / 0.674V
T 28.3
Q 5.5
Monday, October 21, 2013, 13:52: TGHT off.
TGHT
T 27.9
Q 5.5
Tuesday, October 22, 2013, 08:09: Stopped turbos. Vacuum at 1.4E-7 T
Tuesday, October 22, 2013, 12:29: Venting
Results in DocuShare collection |