Message ID: 925     Entry time: Tuesday, May 10, 2022, 10:09
Author: Aaron Schmidt 
Target/No.#:  
Source: P2N-SIS 
Station: ITE 
Module: TM4 
Target Oven W.O#: 45241-1 
Heat Shield W.O#: 45240-1 
Status: In progress 
Subject: P2N assembly conditioning - 2 

 Ref: https://elog.triumf.ca/TIS/Test-Stand/924. During testing, it was noted one leg was glowing vs the other. P2N assembly was removed & inspected. No contact or defects were found.

Tuesday, May 10, 2022, 10:05: Roughing.

Tuesday, May 10, 2022, 10:42: TP1 on.

Tuesday, May 10, 2022, 10:50: TP1A on.

Tuesday, May 10, 2022, 10:58: IG1 on. Vacuum @ 1.77e-05T & dropping.

Tuesday, May 10, 2022, 13:45: Vacuum @ 5.63e-06T. FS#5 Opened.

Tuesday, May 10, 2022, 13:58: Vacuum @ 5.27e-06T.

 