Screws instead of rivets on target leg. Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing
Thursday, July 04, 2019, 16:00: Turbos on.
Thursday, July 04, 2019, 16:12: IG1 on. RGA on
Friday, July 05, 2019, 08:12: Waterlines opened. No response on RGA. Vacuum ok @ 4.57e-06T.
Friday, July 05, 2019, 08:14: Power / sources on.
LE,FM
Friday, July 05, 2019, 10:00: Autoramping TGHT/TBHT to 250/100 A @ 3 A/min. Vacuum limits change to 5e-6 T and 5.5e-6 T. Vacuum ok @ 4.2e-6 T.
Friday, July 05, 2019, 11:42 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.06 |
6.46 |
TBHT |
27.91 |
9.01 |
COIL + EE |
27.82 |
2.80 |
TGHT |
27.93 |
6.82 |
Friday, July 05, 2019, 11:45 : Auto ramping TGHT/TBHT to 300/150A @ 3 A/min.
Friday, July 05, 2019, 17:32:
Friday, July 05, 2019, 13:56: Source/Optics on
Friday, July 05, 2019, 14:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.
Friday, July 05, 2019, 17:32: BIAS / EE / EZL @ 0 for the weekend. Heater will be left on.
FM
Monday, July 08, 2019, 15:12: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, July 08, 2019, 18:59: BIAS / EE / EZL @ 0.00 kV
Tuesday, July 09, 2019, 13:42: TBHT/TGHT @ 590/230A.
Tuesday, July 09, 2019, 13:49 BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, July 09, 2019, 14:04: Dipole magnet not responding. Cycling the PS on EPICS didn't work. Cycling the PS directly worked.
Tuesday, July 09, 2019, 17:28: BIAS / EE / EZL @ 0.00 kV
|