Message ID: 731     Entry time: Tuesday, June 11, 2019, 14:33
Author: Aaron Schmidt 
Target/No.#: Test FEBIAD 
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: 395530-3 
Heat Shield W.O#: 42752-5 
Status: In progress 
Subject: ISAC Source tray re-installed w/ optics tray. 

Tuesday, June 11, 2019, 14:33: Roughing.


Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.

Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.

Wednesday, June 12, 2019, 11:13: Turbo pumps on.

Wednesday, June 12, 2019, 11:21: Ion gauge on. 

Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.


Thursday, June 13, 2019, 10:27:

He Leak TEST:

Vacuum Group Leak detector LD#4.

Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.20e-006

He: 4.55e-010

LD:  1.2e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35:

Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:

Water: 2.20e-006

He: 4.20e-010

LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.

Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:

Water: 2.18e-006

He: 3.68e-010

LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.

Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:

Water: 2.16e-006

He: 9.24e-011

*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.

Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:

Water: 2.15e-006

He: 2.06e-010

*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*

Purge and close FS#4.

Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:

Water: 2.13e-006

He: 2.75e-010

LD: 1.7e-08 atm-cc/sec. Purge and close FS#5

Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines. 

Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:

Water: 2.12e-006

He: 6.21e-010

LD: 3.3e-08 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.

Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.

Thursday, June 13, 2019, 14:03: New TGHT PS installed.

Thursday, June 13, 2019, 14:06: Power / sources on.

Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)

Thursday, June 13, 2019, 14:21: Spark*

Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.

Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.

Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.


Friday, June 14, 2019, 06:52: Restart RGA.

Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.

Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.

Friday, June 14, 2019, 08:48: Gas lines fully opened.

Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.

Friday, June 14, 2019, 08:52: HV sources ready.

FM

Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.

AS

Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.

Friday, June 14, 2019, 11:18: Optics set.

Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.

Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.


Monday, June 17, 2019, 08:34: TMS:MB1 - Reset. 

Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.

FM

Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A  ~2A/min


Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.

Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.


AS

Wednesday, June 19, 2019, 07:10: IV4 Closed.

Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.

Wednesday, June 19, 2019, 07:15: RGA off.

Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.

Wednesday, June 19, 2019, 08:35: Purging / venting.