Message ID: 599     Entry time: Monday, July 17, 2017, 10:04
Author: Aaron Schmidt 
Target/No.#:  
Source: HP-SIS 
Station:  
Module:  
Target Oven W.O#: 42218-10 
Heat Shield W.O#: 42738-1 
Status:  
Subject: Target cleaning test HP-SIS Full Clean  

 Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 42738-1: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


HP-SIS Target # 42218-10: Full Clean. Crystal Clear, Acetone, & Methanol used.


Thursday, July 27, 2017, 09:49: HS removed from test stand. Exchange target.

Thursday, July 27, 2017, 10:07: Target # 42218-10 placed into test stand. Door open for 20 minutes.

Thursday, July 27, 2017, 10:10: Roughing.

Thursday, July 27, 2017, 10:10: Doors sealed for roughing.

Thursday, July 27, 2017, 10:13 BV1B OPEN. Opened @ 230T.

Thursday, July 27, 2017, 10:29: Both Turbo pumps started.

Thursday, July 27, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, July 27, 2017, 10:37: TP1A @ speed 38 KRPM.

Thursday, July 27, 2017, 10:40: RGA on. Vacuum @ 1.42T.

Thursday, July 27, 2017,15:00: Check. Vacuum @ 5.51e-07T.

Thursday, July 27, 2017, 15:02: Waterlines opened. No response on RGA. Vacuum @ 5.42e-07T

Thursday, July 27, 2017, 15:05: Power on.


Friday, July 28, 2017, 08:30: Ramping started


Monday, July 31, 2017, 07:56: Ramping down

Monday, July 31, 2017, 14:25: Power supplies off. RGA off.


Tuesday, August 15, 2017, 06:48: Ion gauge, Turbo pumps off.

Tuesday, August 15, 2017, 06:50: power off. Waterlines purged.

Tuesday, August 15, 2017, 07:55: Venting.

Attachment 1: HP-SIS_Full_Clean_(Short).docx  814 kB  Uploaded Thursday, August 10, 2017, 10:35
Attachment 2: TS-2017-07-27-10-40.rga  3.033 MB  Uploaded Thursday, August 10, 2017, 10:35