Thermocouples installed on the left end plate x 2.
Monday, September 25, 2023, 16:23: Roughing.
Monday, September 25, 2023, 16:51: TP1B on.
Monday, September 25, 2023, 16:56: Waterline FS#5 open. Vacuum ok.
Monday, September 25, 2023, 16:58: Power on. TP1A on.
Tuesday, September 26, 2023, 09:44: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per minute.
Tuesday, September 26, 2023, 16:11: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per minute.
Tuesday, September 26, 2023, 16:12: IV4 opened.
Tuesday, September 26, 2023, 16:45: Optics on/set. BIAS / EE / EZL @ 1 / -0.5 / 1 kV. TC @ 47 / 51 C
Tuesday, September 26, 2023, 21:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Spark @ 28 kV.
Tuesday, September 26, 2023, 21:41: Mass & wire scans taken. Masses from 110 to 160? Curious.
Wednesday, September 27, 2023, 08:24: TC @ 71 / 79 C.
Wednesday, September 27, 2023, 11:57: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, September 27, 2023, 12:06: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Spark right after.
Wednesday, September 27, 2023, 12:23: Recovered computer & epics controls from previous spark.
Wednesday, September 27, 2023, 12:36: BIAS / EE / EZL @ 45 / -2.3 / 19 kV. Spark @ 44.5 kV.
Wednesday, September 27, 2023, 13:17: Large spark *
Wednesday, September 27, 2023, 13:21: Closed IV4. Reset TSG:TP1B. TMS:TP6 Spinning up? Did not reset right away. Reset optics. Epics & Firefox on the TS computer are down.
Wednesday, September 27, 2023, 13:26: BIAS / EE / EZL @ 40 / -2.0 / 17 kV. Plus 1 spark while tapping the HV down. TMS:TP6 has recovered.
Wednesday, September 27, 2023, 14:01: HV to 0 kV. TS computer is disconnected from the network but epics is still running.
Wednesday, September 27, 2023, 14:05: TC @ 69.8 / 81 C
Thursday, September 28, 2023, 09:23: TS computer is running again. Continue HV tests.
Thursday, September 28, 2023, 09:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, September 28, 2023, 09:47: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.
Thursday, September 28, 2023, 10:43: No sparks thus far.
Thursday, September 28, 2023, 10:46: BIAS / EE / EZL @ 45 / -2.3 / 19 kV.
Thursday, September 28, 2023, 10:50: Gauge for FEBIAD gases is "buzzing".
Thursday, September 28, 2023, 10:52: BIAS / EE / EZL @ 47.5 / -2.5 / 20 kV.
Thursday, September 28, 2023, 11:35: No sparks occurred. BIAS / EE / EZL @ 0 kV.
Thursday, September 28, 2023, 11:41: PS off. IV4 closed.
Thursday, September 28, 2023, 11:42: IG1 off. Turbo pumps off.
Thursday, September 28, 2023, 12:35: Venting.
|