Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand  Not logged in ELOG logo
Message ID: 693     Entry time: Monday, October 29, 2018, 11:03
Author: Aaron Schmidt 
Target/No.#:  
Source: LP-FEBIAD 
Station:  
Module:  
Target Oven W.O#: 41790-9 
Heat Shield W.O#: 42752-5 
Status: Done 
Subject: Test FEBIAD w/ Silver bolts & sealed end caps 

Restarting FEBIAD

Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.

Monday, October 29, 2018, 11:03: Ion gauges on.

Monday, October 29, 2018, 11:10: Power on

Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.

Monday, October 29, 2018, 11:20: RGA restarted.


Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.

Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.

Tuesday, October 30, 2018, 07:31: Optics set.

Tuesday, October 30, 2018, 07:32 : IV4 Opened.

Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.

Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.

Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.

Tuesday, October 30, 2018, 08:57: Power shut off & restarted.

Tuesday, October 30, 2018, 09:01: Gases re-opened.

Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.

Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.

Tuesday, October 30, 2018, 10:41: IV4 Opened.

Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given

Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.

Tuesday, October 30, 2018, 10:55: Optics reset.

Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.


Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.

Wednesday, October 31, 2018, 07:00: Coil @ 50 A.

Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.


FM:

Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.

Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.

Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.

Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.

Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.

Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA

Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.

Voltage drop from 200 to 196 V.  The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .

Voltage back to 200 V 


FM

Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.

Anode set to 150 V. FC6 stable

Thursday, November 01, 2018, 11:37 Closing Neon Valve

Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.

Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency  measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!

Thursday, November 01, 2018, 13:08 : Opening the valves

Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.

Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve

Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%

Opening gas valves


FM

Friday, November 02, 2018, 09:39 : Increasing AV to 200V.

Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.

Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.

Leaving the cathode hot to continue test tomorrow morning.


Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.


Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.

Cooling down manually  TBHT to 300 A @ 2A per min.


Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.

Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.

Monday, November 05, 2018, 14:22: Gas lines closed.

Monday, November 05, 2018, 14:32: Sources/power off.

Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.

Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off.

ELOG V2.9.2-2455