Message ID: 964     Entry time: Monday, May 01, 2023, 14:31
Author: Aaron Schmidt 
Target/No.#: TiC#5 
Source: LP-FEBIAD 
Station: ITE 
Module: TM4 
Target Oven W.O#: 44692-5 
Heat Shield W.O#: 45235-20 
Status: In progress 
Subject: Conditioning TiC#5 

New TiC LP-FEBIAD Target installed.

Monday, May 01, 2023, 14:23: Roughing.

Monday, May 01, 2023, 21:42: TP1B on 

Monday, May 01, 2023, 21:49: TP1A on. 

Monday, May 01, 2023, 21:57: IG1 on. 


Tuesday, May 02, 2023, 08:39: Vacuum @ 1.16e-06T. Waterline FS#5 opened.

Tuesday, May 02, 2023, 08:48: Power / sources on. Source gas set. SV5 remains open.

Tuesday, May 02, 2023, 09:00: Optics set.

Tuesday, May 02, 2023, 09:13: System ready check - OK. Manually set.

TGHT / TBHT @ 5 / 5 A

BIAS / EE / EZL @ 1 / -0.5 / 1 kV

Anode @ 100 V - 10.989 mA

Coil @ 10 A.

Tuesday, May 02, 2023, 10:12: Coil @ 70 A. Tapped up manually @ 7 A per minute.  

Tuesday, May 02, 2023, 12:20:

Tap up Anode in steps @ 20 v per 20 seconds.

Anode @ 100 V = 10.989 mA

Anode @ 200 V = 12.210 mA

Anode @ 300 V = 12.210 mA

Anode @ 400 V = 13.431 mA 

Tuesday, May 02, 2023, 12:36: Anode @ 20 V. 

Tuesday, May 02, 2023, 12:53: BIAS / EE / EZL @ 10 / -0.5 / 5 kV


Wednesday, May 03, 2023, 04:30: Auto-ramping TGHT / TBHT to 550 / 280 A @ 1 A per minute. 

Wednesday, May 03, 2023, 10:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

TGHT / TBHT @ 360 / 280 A. Ramping ongoing. 

Wednesday, May 03, 2023, 14:04: TGHT / TBHT @ 550 / 280 A

Wednesday, May 03, 2023, 14:10: Anode tapped up to 100 V @ 20 V per 20 seconds.

Wednesday, May 03, 2023, 14:25: Large spark*. Reset Optics.  

Wednesday, May 03, 2023, 14:46: Mass & wire scans complete. 

Wednesday, May 03, 2023, 17:05: Anode & coil checks complete. Auto-cooling of TGHT / TBHT @ 1 / 2 A per minute.

Wednesday, May 03, 2023, 22:51: IV4 closed. 


Thursday, May 04, 2023, 07:35: SV5 closed. Sources / Power off.

Thursday, May 04, 2023, 07:37: IG1 off. TP off.

Thursday, May 04, 2023, 09:17: Venting.

Attachment 1: TiC#5_-_44692-5_Anode_&_Coil_checks.docx  251 kB  Uploaded Tuesday, May 02, 2023, 13:56
Attachment 2: TiC#5_-_44692-5_Conditioning.docx  662 kB  Uploaded Wednesday, May 03, 2023, 23:54