New TiC LP-FEBIAD Target installed.
Monday, May 01, 2023, 14:23: Roughing.
Monday, May 01, 2023, 21:42: TP1B on
Monday, May 01, 2023, 21:49: TP1A on.
Monday, May 01, 2023, 21:57: IG1 on.
Tuesday, May 02, 2023, 08:39: Vacuum @ 1.16e-06T. Waterline FS#5 opened.
Tuesday, May 02, 2023, 08:48: Power / sources on. Source gas set. SV5 remains open.
Tuesday, May 02, 2023, 09:00: Optics set.
Tuesday, May 02, 2023, 09:13: System ready check - OK. Manually set.
TGHT / TBHT @ 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV
Anode @ 100 V - 10.989 mA
Coil @ 10 A.
Tuesday, May 02, 2023, 10:12: Coil @ 70 A. Tapped up manually @ 7 A per minute.
Tuesday, May 02, 2023, 12:20:
Tap up Anode in steps @ 20 v per 20 seconds.
Anode @ 100 V = 10.989 mA
Anode @ 200 V = 12.210 mA
Anode @ 300 V = 12.210 mA
Anode @ 400 V = 13.431 mA
Tuesday, May 02, 2023, 12:36: Anode @ 20 V.
Tuesday, May 02, 2023, 12:53: BIAS / EE / EZL @ 10 / -0.5 / 5 kV
Wednesday, May 03, 2023, 04:30: Auto-ramping TGHT / TBHT to 550 / 280 A @ 1 A per minute.
Wednesday, May 03, 2023, 10:42: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
TGHT / TBHT @ 360 / 280 A. Ramping ongoing.
Wednesday, May 03, 2023, 14:04: TGHT / TBHT @ 550 / 280 A
Wednesday, May 03, 2023, 14:10: Anode tapped up to 100 V @ 20 V per 20 seconds.
Wednesday, May 03, 2023, 14:25: Large spark*. Reset Optics.
Wednesday, May 03, 2023, 14:46: Mass & wire scans complete.
Wednesday, May 03, 2023, 17:05: Anode & coil checks complete. Auto-cooling of TGHT / TBHT @ 1 / 2 A per minute.
Wednesday, May 03, 2023, 22:51: IV4 closed.
Thursday, May 04, 2023, 07:35: SV5 closed. Sources / Power off.
Thursday, May 04, 2023, 07:37: IG1 off. TP off.
Thursday, May 04, 2023, 09:17: Venting. |